Societynationalverified · 90%

Drawbridge Operation Regulation; Wishkah River, Aberdeen, WA

When
· day precision
Where
United States, US
Category
government_regulation · proposed_rule

The Coast Guard proposes to change the operating schedule that governs the Puget Sound and Pacific railroad bridge (PS&P) across the Wishkah River, mile 0.1 in Aberdeen, WA. Based on infrequent drawbridge openings, Genesee & Wyoming Inc. (GWRR), the bridge owner, is requesting to change the default draw position from the fully open position to the fully closed-to-navigation position. In addition, the proposed rule will require 24-hour notice for all drawbridge openings. Based on these proposed changes in operating schedule, there would no longer need to always have a bridge operator on site. We invite your comments on this proposed rulemaking.

Sources

Defaxon links out to the original reporting and never republishes article text.

Correlated events

Computed by the Defaxon correlation engine — linked by shared actors, co-location, and temporal proximity. Scored hypotheses, never causal claims.

← Back to the live map